If any waters or wastes are discharged, or are proposed to be discharged to the public sewers, which waters contain substances or possess characteristics which in the judgment of the public works director, may have a deleterious effect upon the sewage works, processes, equipment, or receiving waters, or which otherwise create a hazard to life or constitute a public nuisance, the public works director may:
(a) Reject the wastes,
(b) Require pretreatment to an acceptable condition for discharge to the public sewers;
(c) Require control over the quantities and rates of discharge;
(d) Require payment to cover the added cost of handling and treating the wastes not covered by existing taxes or sewer charges under the provisions of 15-416.
If the public works director permits the pretreatment or equalization of waste flows, the design and installation of the plants and equipment shall be subject to review and approval of the public works director, and subject to the requirements of all applicable codes, ordinances and laws.
(Ord. 470, Ord. 648; Art. V, Sec. 5, Code 2004)
(Ord. 470, Art. V, Sec. 6; Code 2022)
Where a public sanitary sewer is not available under the provisions of this chapter, the building sewer may be connected to a private sewage disposal system complying with the provisions of this article and with written approval of the public works director.
(Code 1971, Sec. 9-106; Code 1984)
The cost and expense of the installation and connection must be borne by the owner. Such installation and connection must comply with all the provisions of this code and all other applicable regulations and laws. The tap fee shall be as set out in Chapter 17.
(Ord. 406, Sec. 2; Code 2003; Code 2007)
Any installation as provided for by this article shall be made by persons licensed to perform such work in the city and the owner shall indemnify, defend and hold harmless the city from any loss or damage that may directly or indirectly be occasioned by the installation of the sewer tap and connection.
(Ord. 406, Sec. 3; Code 2003)
The sewer connection shall not be covered by any material until a final inspection has been made by the public works director or his or her authorized designee and written permission has been given to cover such connections to the sewer system.
(Ord. 406, Sec. 4)
Before commencement of construction of a private sewage disposal system the owner shall first obtain a written permit signed by the public works director. The application for such permit shall be made on a form furnished by the city, which the applicant shall supplement by any plans, specifications, and other information as are deemed necessary by the public works director. A permit and inspection fee as set out in Chapter 17 shall be paid to the city at the time the application is filed.
(Ord. 470, Art. III, Sec. 2; Code 2003)
A permit for a private sewage disposal system shall not become effective until the installation is completed to the satisfaction of the public works director. He or she shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the public works director when the work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within twenty-four (24) hours of the receipt of notice by the public works director provided that the twenty-four (24) hour notice will allow the inspection to occur during normal working hours.
(Ord. 470, Art, III, Sec. 3)
The type, capacities, location, layout and lot area for construction of private sewage disposal systems shall comply with all recommendations and requirements of the Sedgwick County Community Health Department and the State Department of Health and Environment. No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 20,000 square feet. No septic tank or cesspool shall be permitted to discharge into any public sewer or natural outlet.
(Code 1971, Sec. 9-109, Ord. 470, Art. III, Sec. 4; Code 2003)
At such time as a public sewer becomes available to a property served by a private sewage disposal system, a direct connection shall be made to the public sewer in compliance with this article, and any septic tanks, cesspools, and similar private sewage disposal facilities shall be abandoned, cleaned of sludge and filled with gravel or dirt, Provided that the waste produced can be processed by the wastewater treatment facility as determined by the public works director.
(Code 1971, Sec. 9-110; Ord. 470, Art. III, Sec. 5)
There is hereby adopted by reference by the city of Haysville, Kansas, for the purpose of establishing standards for the safety, health, and public welfare, the construction standards for septic system absorption fields, and other private sewage facilities, all such regulations as promulgated by, and adopted by, Sedgwick County, Kansas, the most recent version of which became effective within the unincorporated portions of Sedgwick County, Kansas, on June 20, 2014, to be applied where such systems are permitted within the city of Haysville, Kansas. One copy of construction standards for septic system absorption fields, and other private sewage facilities, as promulgated by Sedgwick County, Kansas, shall be filed in the office of the city clerk and are hereby adopted and incorporated as if fully set out herein at length as authorized in the manner provided by K.S.A. 12-3009, et seq.
(Ord. 882)
The owner shall operate and maintain the private sewage disposal facilities in a sanitary manner at all times, at no expense to the city. Private sewage facilities are all such facilities regulated pursuant to those standards adopted in 15-411 above, and include: septic systems and laterals, sewage lagoons, advanced wastewater systems, remediation units. Owners of property upon which private sewage facilities are to be located, or upgraded, shall sign an easement and restrictive covenant with the City, in conformance to the regulations adopted in 15-411 above, prior to receiving a permit for such construction.
(Code 1971, Sec. 9-111; Ord. 470, Art. III, Sec. 6)
Where preliminary treatment or flow-equalizing facilities are provided for any waters or wastes, they shall be maintained continuously in satisfactory and effective operation by the owner at his or her expense.
(Ord. 470, Art. V, Sec. 7)
When required by the public works director, the owner of any property serviced by a building sewer carrying industrial wastes shall install a suitable control manhole together with such necessary meters and other appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastes. Such manhole shall be installed by the owner at his or her expense, and shall be maintained by him or her. It is unlawful to cover or conceal manholes.
(Ord. 470, Art. V, Sec. 8; Code 2003)
All measurements, tests, and analyses of the characteristics of waters and wastes to which reference is made in this chapter shall be determined in accordance with the 18th edition of “Standard Methods for the Examination of Water and Wastewater,” published by the American Public Health Association, and shall be determined at the control manhole provided, or upon suitable samples taken at the control manhole. In the event that no special manhole has been required, the control manhole shall be considered to be the nearest downstream manhole in the public sewer to the point at which the building sewer is connected. Sampling shall be carried out by customary accepted methods to reflect the effect of constituents upon the sewage works and to determine the existence of hazards to life, limb and property. The particular analyses involved will determine whether a grab sample or samples should be taken. Normally, but not always, BOD and suspended solids analyses are obtained from twenty-four (24) hour composites of all outfalls whereas PH are determined from periodic grab samples.
(Ord. 470, Art. V, Sec 9; Code 2003)
No statement contained in this article shall be construed as preventing any special agreement or arrangement between the city and any industrial concern whereby an industrial waste of unusual strength or character normally requiring pretreatment before acceptance may be accepted by the city for treatment, subject to payment therefore, by the industrial concern.
(Ord. 470, Art. V, Sec. 10)
No person shall maliciously, willfully, or negligently break, damage, destroy, uncover, deface or tamper with any structure, appurtenance, or equipment which is a part of the municipal sewage works. Any person or entity violating this section shall be subject to criminal prosecution therefore and liable for payment of any damages caused by such violations.
(Ord. 470, Art. V, Sec. 10; Code 2003)
The public works director and other duly authorized employees of the city bearing proper credentials and identification shall be permitted to enter all properties for the purposes of inspection, observation, measurement, sampling and testing in accordance with the provisions of this article, and such persons shall be authorized to make application to a court of competent jurisdiction ordering that such access be provided should such access be denied. The public works director or his or her representatives shall have no authority to inquire into any process including metallurgical, chemical, oil, refining, ceramic, paper, or other industries beyond that point having a direct bearing on the kind and source of discharge to the sewers or waterways or facilities for waste treatment.
(Ord. 470, Art. VII, Sec. 1; Code 2003)
While performing the necessary work on private properties referred to in section 15-418, the public works director or duly authorized employees of the city shall observe all safety rules applicable to the premises established by the company and the company shall be held harmless for injury or death to the city employees and the city shall indemnify the company against loss or damage to its property by city employees and against liability claims and demands for personal injury or property damage asserted against the company and growing out of the gauging and sampling operation, except as such may be caused by negligence or failure of the company to maintain safe conditions as required by section 15-413.
(Ord. 470, Art. VII, Sec. 2)
The public works director and other duly authorized employees of the city bearing proper credentials and identification shall be permitted to enter all private properties through which the city holds an easement for the purposes of, but not limited to, inspection, observation, measurement, sampling, repair, and maintenance of any portion of the sewage works lying within the easement, and such persons shall be authorized to make application to a court of competent jurisdiction ordering that such access be provided should such access be denied. All entry and subsequent work, if any, on the easement shall be done in full accordance with the terms of the duly negotiated easement pertaining to the private property involved.
(Ord. 470, Art. VII, Sec. 3; Code 2003)
(a) Any person who shall violate the provisions of this Chapter or shall fail to comply with any of the requirements thereof, or who shall act in violation of the approved plan or directive of an official or of a permit or certificate issued under the provisions of this code shall be guilty of a misdemeanor and shall be punished by a fine of not more than $500.00 for each violation or thirty (30) day confinement in the county jail for each violation or by both such fine and imprisonment, unless a specific penalty provision shall have been made applicable to any specific section of this Chapter. Each day of violation shall be a separate violation. Furthermore, such person may be required to repair or correct any violation and pay all costs associated therewith.
(b) Penalty Clause Not Exclusive. The imposition of the penalties herein prescribed shall not preclude the city from instituting an appropriate action to restrain, correct, or abate a violation of this article, and specific authority for such is hereby granted to take any action or imposing any penalty allowed by the State law, this article or any provision of this code.
(Code 1971, Sec. 9-139; Code 1984, Ord. 882; Code 2015)
Enforcement of this code within the boundaries of the city shall be by the code enforcement official(s) designated by the City, and jurisdiction for prosecution of any violations of this code shall be in the Haysville Municipal Court.
(Ord. 882)
Requirements of this code and article in force shall not be construed as imposing on the city, its officers, agents, or employees, any liability or responsibility for any damages to any property or any injury to any person due to defective installation or any other reason.
(Ord. 882)